Public contract award · eTenders 5050189
- Framework agreement
Tender stage for ENQEIR885 ENGINEERING DESIGN, PLANNING AND PROJECT MANAGEMENT FRAMEWORK
EirGrid plc awarded this contract to AECOM Ltd; AtkinsRéalis; Jacobs Engineering Ireland Ltd; Tetra Tech Ireland Limited; Turner and Townsend Ltd on 9 September 2025, using a simplified procedure. The notice publishes €5 as a ceiling for everything that may be bought under this framework, not as money spent. The published term is 96 months, to Sept 2033.
- Award published
- Term ends
Open the eTenders data on data.gov.ie (opens in a new tab)How to check this record
Who awarded it, and to whom
- SupplierAECOM Ltd; AtkinsRéalis; Jacobs Engineering Ireland Ltd; Tetra Tech Ireland Limited; Turner and Townsend LtdNot matched to a company record
How long does it run?
A published term of 8 years, to Sept 2033.
The term is the notice’s duration counted from the award date. A contract may be extended or end early; the notices do not say.
What the notice says
- Procedure
- SimplifiedA lighter process used for lower-value or light-regime contracts.
- Competition type
- SimplifiedAwarded under a simplified process.
- Subject (CPV)
- Engineering services
- eTenders tender ID
- 5050189eTenders' own page for a tender needs a free supplier login, so this record links to the OGP open data on data.gov.ie instead.
Check it yourself
The official record this page is built from.
- eTenders awards dataset (OGP, data.gov.ie) (opens in a new tab)One file for every eTenders award: look for tender ID 5050189. eTenders' own tender pages need a login.
Cite this record
"Tender stage for ENQEIR885 ENGINEERING DESIGN, PLANNING AND PROJECT MANAGEMENT FRAMEWORK", contract award record on Declared (declared.ie), compiled from OGP open data row · tender 5050189. https://declared.ie/contracts/ogp-5050189-2627/tender-stage-for-enqeir885-engineering-design-planning-and. Data refreshed 12 October 2026.
Published records, not allegations. An award shows who a public body chose to buy from, as it published; it is not a payment and says nothing about how the supplier was chosen beyond what the notice states.