Public contract award · eTenders 4071150
Design Services for bridge and viewing platform replacement along the Great Western Greenway Co. Mayo
Mayo County Council awarded this contract to Mfa Consulting Engineers Limited on 19 September 2024, using an open procedure, and 3 bids were received. The notice publishes a value of €18,450. The published term is 2 months, to Nov 2024.
- Award published
- Term ends
Open the eTenders data on data.gov.ie (opens in a new tab)How to check this record
Who awarded it, and to whom
- SupplierMfa Consulting Engineers LimitedMatched by exact name
How big is it?
Larger than 7% of contract awards, and number 199 of 250 from this public body.
A log scale: each step is ten times the last. “Typical” is the median contract award, €200K.
How long does it run?
A published term of 2 months, to Nov 2024.
The term is the notice’s duration counted from the award date. A contract may be extended or end early; the notices do not say.
What the notice says
- Procedure
- Open ProcedureAny business could bid.
- Competition type
- BespokeA one-off contract tendered for this purchase.
- Bids received
- 3Bids the buyer received from businesses.
- Subject (CPV)
- Architectural services for outdoor areas
- eTenders tender ID
- 4071150eTenders' own page for a tender needs a free supplier login, so this record links to the OGP open data on data.gov.ie instead.
Check it yourself
The official record this page is built from.
- eTenders awards dataset (OGP, data.gov.ie) (opens in a new tab)One file for every eTenders award: look for tender ID 4071150. eTenders' own tender pages need a login.
Cite this record
"Design Services for bridge and viewing platform replacement along the Great Western Greenway Co. Mayo", contract award record on Declared (declared.ie), compiled from OGP open data row · tender 4071150. https://declared.ie/contracts/ogp-4071150-17063/design-services-for-bridge-and-viewing-platform-replacement. Data refreshed 12 October 2026.
Published records, not allegations. An award shows who a public body chose to buy from, as it published; it is not a payment and says nothing about how the supplier was chosen beyond what the notice states.